Skip to main content

Design Journal 27/04/20: Articulation of space

Lots of ramps were constructed in accordance with Chris' advice. these help to create a journey through the building allows for complex connections between spaces at odd relative depths.

The random forms were turned into simplified structural members allowing for the complete construction of the academic complex along the east elevation of the building. The entire South quarter is completed, only glass furniture and materials needing to be added. This contains Academic offices, Dean's office, meeting rooms, a lecture theatre and staff kitchenette.

The NE quarter is nearing completion with the open-air courtyard becoming more detailed, sophisticated and interconnected. A second open-air lecture theatre was constructed alongside various ramps and lifts. The section was also grounded for structural integrity but work still remains... Mainly with regards to detailing the outdoor study spaces, Chris suggested a Caffe which is a possibility I am open to examining.  I am also thinking about not overusing my cubist balustrades and so will need to examine another mechanism to close off the space. The biggest issue is with entry, I have no idea how I'm going to create an atrium/foyer/lobby and in which orientation I will do so. The structure has presented me with a possible envelope which I hope to examine and execute effectively.

Similar issues arise in the SE quarter which now has all of its connecting ramps in place, however much of the SW is incomplete as is the proposed entrance form union road so its unlikely I can make many useful comments about this simply due to the intuitive nature fo the design process.

I'm very happy with the connections within the central hall they convey a sense of space and the complexity is still perversive whilst the ramps provide functionality add sophistication curves to reduce the curvilinear normalcy of expectation. I have defined more spaces which is nice, but it's getting late so i won't really be writing up all of the details... always enjoy!












Comments

Popular posts from this blog

Evidence of Submission

https://3dwarehouse.sketchup.com/embed/4ae9704e-23b1-47bd-8738-1d44680d980d Note: The originial size of my Sketch-Up file was 100MB which exceeded the 45MB allowable upload limit for 3D Warehouse. However when made to upload the file, Sketch Up automatically adjuested the file size to within the requirements, I am unware of the process by which this was done and so can not attest for the quality of the final model in relation to the model which is visible infront of me the author. To download the original model please click the google drive link below, taking care to download both the .skp and .skb files before opening. https://drive.google.com/open?id=1yvdMAz2PMUxV0mcoWn6G9GlERUjdHA70

Design Journal 08/03/2020

Begun translating mys section into a 3D Design, currently the exterior of the upper floor and gallery is complete. Two Stairs need to be either redesgined or added, and lansdcape modelling is incomplete. Basic progression in the build is shown through the images below. The following section has been chosen for construction. Diffuse Striation The hexagonal dome was the most obious part of the section and so was intially constructed, a smaller dome being madw within to act as a sort of photography studio for the Kyza. The stright parts of the section were elongated into a trapezoidal shape to accomodate a geodesic structure at the edge. The edges expand to emphasise the experience of the widening of the space and the panoramic views of the landscape offered. The first floor was similarly articulated with basic geometric shapes and considerations for natural lighting through galss windows.  To increase the complexity of the stuructre curves were added into the roof  to metonomise...

Cardboard Model Making

This blog post details my procedure for making an archtiectual model of my room thorugh snapshots of the desgin process. This model is made cardboard on a 1: 20 scale. The model itself was initially glued together but due to the thick corrugation the glue started to seep in and lose strength, as a result tape was added for extra reinforcement.